Producing an AI roadmap for a specialist acoustic engineering consultancy

A specialist acoustic engineering consultancy had used AI across the team for a year without a shared view of where it should and should not be used. Build Your AI put the first tools into use within a week and gave the directors a ranked plan for what to fund next.

Client
Specialist acoustic engineering consultancy
Sector
Noise and vibration consultancy
Engagement
AI capability building, automation discovery and prototyping, data and governance foundations
Ladder phase
Assess & Identify

The numbers

Prototypes built with the engineers
7
From working sessions to first tools in use
1 week
Manual exclusions matched by the screening tool
166 of 171
A week of sessions and 2 weeks of synthesis
3 weeks
Spent screening each dataset by hand before
Up to 1 day
Spent tracing each site plan drawing before
Up to 1 hr
Spent drafting a simple proposal before
30 min
Of training before the working sessions
1 day

A year of AI use with no consistent approach

The firm serves construction, environmental and renewable energy projects. Its engineers had used AI tools in their daily work for a year, but each person used them in their own way, and the firm wanted a consistent approach it could rely on.

Much of the firm's analysis expertise sat with a few experienced engineers. They had built Python notebooks to speed up data analysis. Each notebook needed Python installed and coding knowledge to run or change, so the wider team could not use them. The firm stored years of measurement data project by project, which prevented any tool from searching across projects.

The director wanted AI to make his staff more effective without replacing anyone. He also wanted processes documented well enough to keep running when everyone was busy. He was wary of spending on tools that staff would leave unused, so the brief had 3 parts. We had to find where AI and automation fit the business, rank the options on evidence with the people doing the work, and prove the approach with early builds.

Our approach

  1. The engagement started with a training day on how AI behaves, where it fails and how to judge its output. The engineers could then identify where AI fits their own work.
  2. We ran a week of short working sessions with each engineer. In each session we mapped the engineer's workflow using real files, found where the hours went and where the data was stored, and built a prototype with them.
  3. Over the following 2 weeks we scored every use case on 1 framework and sequenced the use cases into a roadmap. The framework covers value, confidence and ease, adoption readiness, risk, evidence and fit.
  4. We put governance in place alongside the builds. It covers how staff may use AI, where the firm's data should live and how the directors keep their systems secure.

We followed 2 principles throughout.

  1. We designed each tool with the engineer who would use it. The engineers shaped the tools, owned the results and saw their own bottlenecks addressed, which keeps a tool in use after the engagement ends.
  2. Fixed logic such as fees, lookups and standard ratings went into code. AI handled the reading, the drafting and the suggestion of options for an engineer to check.

First tools in use within a week

Within a week of the sessions the firm had its first tools in use.

TaskTime beforeWhat changedStatus
Running noise time history analysisNeeded Python and coding skills to changeBrowser tool any engineer can openIn use
Screening field monitoring dataUp to a day per datasetMatched 166 of 171 manual exclusions, each with a reasonValidating on more datasets
Tracing buildings from a PDF site planUp to 1 hour per drawingOutlines placed on the map automaticallyPrototype, accuracy check under way
Drafting a simple proposalAbout 30 minutesDrafts from the firm's own template, with fees and terms confirmed by a consultantIn use

The engineer who uses the noise viewer most added his own features within days. He reports that the viewer now shows patterns in the data that he could not see before.

At the handover, the directors adopted the roadmap. They chose to start with the shared knowledge layer that every later tool reads from.

The screening and noise analysis tools in detail

ToolWhat it replacedWhat the engineer does now
Field data screeningA separate notebook for each logger, with an engineer removing outliers manually.The tool plots each dataset against a reference curve and proposes the points to exclude, each with a reason. The engineer accepts or rejects each proposal.
Noise time history analysisA static chart from a Python notebook that only technical staff could run.Any engineer opens the tool in a browser. They can zoom, inspect the data sample by sample, highlight periods and filter by weather.
The field data screening tool, showing proposed exclusions plotted against a reference curve
Field data screening, shown with synthetic demo data. The tool marks each proposed exclusion and records which check flagged it.
The noise time history tool in a browser, showing 4 sound level metrics over 5 days of logger data
Noise time history analysis in the browser, with 5 days of logger data, highlighted periods and a readout for the selected sample.

What we delivered

We built 7 prototypes. Each prototype aims at 1 clear gain in 1 person's workflow, and all 7 run on tools the firm already pays for, so the firm owns and runs them. The prototypes include a proposal writer, a pricing calculator, the field data screening tool and a tool that turns PDF site plans into map data.

The firm also received:

  • A ranked use case register and roadmap, with a recommendation on what to fund next
  • A data catalogue and information architecture for a shared AI knowledge layer, so every tool reads from 1 trusted source
  • Standard operating procedures for the workflows that the sessions mapped in enough detail
  • Product requirement documents for the larger automations, which need further validation and hardening before production use
  • A draft AI use policy
  • Security and configuration guides for leadership, written with ISO 27001 and Cyber Essentials controls in mind

Where this pattern applies

The same sequence suits any engineering firm where a few experienced people hold the analysis methods and the data sits in project folders. A week of working sessions is enough to show which tasks repay automation, and the first tools give the directors evidence for the roadmap before they commit a budget.

This work is the Assess & Identify phase of the Safe AI Adoption Ladder, the 4-phase method Build Your AI uses to take an engineering organisation from first interest to AI in production. See how the 4 phases fit together.

Want to know where AI would pay back in your engineering team?

Book a free consultation. We will talk through your workflows and your constraints, and suggest a low-risk first step.

Book a consultation

More case studies